22
2025-02
Replacement intervals for spiral liners
The replacement cycle for spiral liners is usually six months. Specifically, when the liner wear is greater than 5mm, the liner must be replaced to prevent the spiral from coming into direct contact with the bottom of the U-channel.
2025-02-22
22
2025-02
Screw liners are mainly used in screw conveyors to protect the equipment, reduce wear and tear, improve conveying efficiency and adapt to various harsh working environments.
2025-02-22
22
2025-02
Protecting equipment: The spiral liner can protect the cylinder of the screw conveyor from the direct impact and wear of the abrasive body and materials, thus prolonging the service life of the equipment.
2025-02-22
22
2025-02
What is the life replacement cycle of the tooth plate
The life and replacement cycle of the toothed plate depends mainly on the environment in which it is used and the material it is designed from.
2025-02-22
Jiangsu Baonuo Casting Co., Ltd.
Mobile: 86-18352660777
E-mail: kun.wang@jsbono.cn
Address: No.89, Liu Hao Road, Liu Hao Town, Haimen District, Nantong City, Jiangsu Province, China.

Sweep the mobile terminal
Copyright©2025 Jiangsu Baonuo Casting Co., Ltd. All Rights Reserved